Accessories
Clothing
Special trousers for concrete workers, galoshes, rubber boots, non-skid shoe covers
Special "extra rubberised" gloves with and without insulation
Tools
Levelling boards
Trowels
Individual hoses ranging from 10 to 40 meters can be extended to the maximum conveying distance for the attached machine
Skip
Skip scraper (for cement screed pumps only)
Cleaning balls - Sponge balls for cleaning screed hoses- the ball is propelled though the hose with water to remove any residual material.
Discharge container (cementitious screed), small container (flowing screed) to determine discharge height
Power trowels with either electric or gasoline-powered engines